Home Menu2024 Bituminous Mill and Overlay
This project is the rehabilitation of the bituminous asphalt surface including milling the pavement surface, crack sealing, patching, spot curb and gutter repair, upgrading sidewalk/trail pedestrian curb ramp facilities and a bituminous asphalt pavement overlay for various streets throughout Shakopee including:
- Valley Park Drive
- Valley Industrial Boulevard North
- Valley Industrial Boulevard South
- Citation Drive
- Valley Industrial Circle
- 4th Avenue from Marschall Road to Shenandoah Drive
- Sommerville Street from 4th Avenue to 5th Avenue and 6th Avenue to Shakopee Avenue
- Fuller Street from 8th Avenue to 10th Avenue and south of Highway 169 to the city limits
- Apgar Street
- Scott Street and Atwood Street from 10th Avenue to Thomas Avenue
- Thomas Avenue from Apgar Street to Fuller Street
- 500 feet of Hennes Street west of Thomas Avenue
- Philipp Way
- Philipp Drive
- Philipp Avenue
- 18th Avenue
- Wyndam Court
- Wyndam Drive from 18th Avenue to Wyndam Court
- Parkview Court
- Minnesota Street north of 7th Avenue
- Kinlock Way, Jarmann Lane, Rymark Court, and Blakewood Drive
- Sarazin Street
- Cavanaugh Drive
- Alysheba Road
- Jeffery Allen Drive
- Atwood Court
May Newsletter (Areas E,F, and G)
May Newsletter (Areas C and D)
June Newsletter (Area B)
July Newsletter (Area A)
Sun Path Sidewalk Newsletter - July
Project Location
Traffic Impact
Roads will be closed for short durations with temporary no overnight parking.
Funding
This project is estimated at $5,260,000. Funding will come from a variety of sources:
- Capital Improvement Fund
- Storm Drainage Fund
- Shakopee Public Utilities
- Sanitary Sewer